The Wastewater System and Potable Water Supply (WW) Program issues water/wastewater permits (WW Permits) for; soil-based wastewater systems with flows of less than 6,500 gallons per day, potable water supplies (water supplies that are not public water supplies), and for municipal water and sewer connections. Permitting staff are located in five regional offices through out the State. Staff also administer the licensed designer program and reviews innovative and alternative systems for potential use in the state.
The map of regional offices provides office location and contact information for each region.
INFORMATION FOR LANDOWNERS AND DESIGNERS
Wastewater System & Potable Water Supply Program Information for Landowners
FINANCIAL ASSISTANCE
Financial assistance is available to homeowners who need to replace their water or wastewater supply.
FORMS
Permit Application Forms
Exemption Forms
Voluntary Revocation Request
GUIDANCE DOCUMENTS
Guidance, practices and procedures
INNOVATIVE/ALTERNATIVE
Innovative and Alternative wastewater products approved by the Program.
LICENSED DESIGNERS
Permits require a qualified Licensed Designer to design the water or wastewater system.
MUNICIPAL CONNECTIONS
Click on this link for information on Municipal Connections.
PERMITS/APPLICATIONS/FEES
- Search for a State-issued permit for wastewater and water system
- Permit Applications
- Permit Fees
- Licensed Designer
- Permits require a qualified licensed designer to design the water or wastewater system.
- Permits require a qualified licensed designer to design the water or wastewater system.
- Permit Documents and Assistance
REPORTED SEWAGE OVERFLOW INCIDENTS
View information regarding recent sewer overflows that have been reported to the Watershed Management Division's Wastewater Management Section.
RULES
All Rules governing the WW Program are found on one page.
Wastewater System and Potable Water Supply Rules Effective April 12, 2019
The Powerpoint slides below were presented to designers to highlight changes between the September 29, 2007 Rules and the Rules adopted in April 12, 2019. The power point slides do not include all relevant information. Readers need to read the complete Sections and Subsections in the Rules effective April 12, 2019 to understand all requirements which may pertain to the landowner.
- Designer Training Subchapter 2
- Designer Training Subchapter 3
- Designer Training Subchapter 3 Exemptions
- Designer Training Subchapter 8
- Designer Training Subchapter 9 - 12
- Designer Training - Soil Evaluation and Simplified Method of Groundwater Mounding
- Well Driller Training
TECHNICAL ADVISORY COMMITTEE
The WW Program receives guidance on the technical issues of the Rules from the Technical Advisory Committee (TAC) which is appointed by the Governor. Information on the scheduled meetings and meeting minutes can be found on the TAC page.
WELL INFORMATION - PRIVATE WATER SUPPLIES
Are you purchasing or selling a property with an onsite well?
You should read information regarding a law that was enacted during the 2011-12 legislative session concerning testing of private water supplies.
You can also find information about your private water supply (onsite well) from the Vermont Department of Health private well section and the Wastewater System & Potable Water Supply Program Public Education and Outreach page.
MAP of WW Program Regional Offices
(Click on the Regional Office link for your town below)