Construction Permits
Permit to Construct
Permit to Construct
Consumer Confidence Reports
2023 CCR Templates are available to be downloaded.
All Public Community Water Systems are required to provide Consumer Confidence Reports (CCRs) to their customers by July 1, 2024.
The EPA requires Wholesalers to provide information contained in their CCR to corresponding Consecutive System(s) by April 1st annually. Consecutive water systems MUST ensure that they deliver the information in the Wholesaler’s CCR to their own customers.
For more information about Draft Water Supply Rule changes click here
Rules and regulations that apply to drinking water systems in the state of Vermont. This includes state statutes as well as federal guidelines that apply to regulated drinking water systems in Vermont.
Well drillers must submit well reports to the state within 90 days of completing, deepening, hydrofracturing, or abandoning a well. The Drinking Water and Groundwater Protection Division (DWGPD) maintains a database of wells drilled in Vermont, including information on location, construction, and well logs. Members of the public can access the Well Completion Reports Searchable Database to find more information about a well.
Rules
The Wastewater System and Potable Water Supply (WW) Program has worked with Vermont State University to develop a voluntary WW Installer Certification Program for contractors who install onsite wastewater treatment (septic) systems and potable water supply connections. The Program provides WW Installers with the information and training associated with the proper siting, design, and construction of wastewater systems and potable water supplies that are regulated by the Wastewater System and Potable Water Supply Rules.
Statutes Related to the Rules
S.27 Act 133
S.27 (Act 133 of the 2001 Adjourned Session)
Summary of ACT 133
Bill S.27 - Major Points Summary