Guidance
Low Risk Site Handbook for Erosion Prevention and Sediment Control
February 1, 2020
Required EPSC Plan for construction activity that is determined to be "Low Risk" under the 3-9020.
Wetlands Site Screening Guidance
March 8, 2023
Tips & Tricks, Tools & Techniques to conduct a desktop review for wetland presence/absence on the land. There are numerous resources out there and things to look for. Please see our YouTube training presentation and this cheat sheet. https://youtu.be/n2pTGVWSeb4
The Vermont Bioengineering Manual
April 6, 2022
To print this Manual, under the printer headings, select “flip on short side,” so it will print landscape, back to back and open properly.