December 17, 2024
This is a required final deliverable for all Clean Water Initiative Program block grants. This Excel file replaces the Final Performance Report for block grants and includes the Stormwater Best Management Practice Report and the Riparian Buffer Planting BMP Report. Please enter each design and implementation project with a WPD ID as its own row in this file. All projects should already have been entered to the Watershed Projects Database via the Batch Import File or ANR Online New Project Form.
File
CWIP Final Performance Report Spreadsheet
(578.95 KB)
File Format