hazardous waste

Biennial Hazardous Waste Report Information

Biennial Reporting

Who needs to report?
All large quantity generators (LQGs); permitted treatment, storage, and disposal facilities (TSDFs); and any other generators that operated as an LQG for any month in 2023 are required to complete the Biennial Hazardous Waste Report (EPA Forms). If you have questions about whether you should complete a report, contact:

Wendy Edwards
802-522-0261
wendy.edwards@vermont.gov

Hazardous Waste Contingency Plan Requirements

A contingency plan must contain:

  • A description of the actions facility personnel must take to comply with §§ 7-308(b)(14)(A) and 7-308(b)(14)(E) of the Vermont Hazardous Waste Management Regulations (VHWMR) in response to fires, explosions or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, groundwater, or surface water at the facility.

Permit Prerequisites

A Certificate of Need is required of any person proposing to begin site preparation for, or construction of, a hazardous waste treatment or disposal facility in Vermont. The requirements for a Certificate of Need are found in Section 7-504(b) of Subchapter 5 of the Vermont Hazardous Waste Management Regulations (VHWMR) and 10 V.S.A. 6606a. The fee for a certificate of need is $7,500.00.