Basins 12 - Basin Planning for the Watersheds Drained by the Deerfield, Green, and North Rivers (Basin 12) and Fall River, and Whetstone, Broad, and Newton Brooks

Deerfield River


 

What's New?

The DRAFT Deerfield Tactical Basin Plan is under review.

Read the DRAFT Deerfield Tactical Basin Plan.

The 2024 Plan is a five-year update of the Deerfield River watershed and the Connecticut River tributaries in southeastern Vermont. The 2024 Plan describes the water quality and habitat conditions and lays out strategies and actions recommended for implementation over the coming years.

The 77 actions identified in the Plan will protect or improve rivers, lakes, and wetlands through cost-effective projects, including floodplain restorations, dam removals and other types of projects in all land use sectors including agriculture, developed lands, wastewater and natural resources. Additionally, this Plan offers strategies to address climate change adaptation and social equity concerns.

Over 130 projects are identified in the Watershed Projects Database and can be found in the Clean Water Project Explorer, an on-line interactive map showing the projects and locations.

Funding is available to implement these projects through state and federal programs. The participation of willing landowners across the Basin is needed to allow these projects to be implemented. Landowners and others interested in participating can contact:

 Marie Levesque Caduto, Watershed Coordinator 
 Vermont ANR / Department of Environmental Conservation
 100 Mineral Street, Suite 303 
 Springfield, VT 05156-3168
 Phone: 802-490-6142
 Email: Marie.Caduto@vermont.gov

Learn more about the Basin in the Deerfield River StoryMap.

Two public meetings were held to discuss the DRAFT Water Quality Plan in October 2024 hosted by State and regional planners. Recordings of these meetings can be viewed.

October 15, 2024       Brattleboro, VT

October 17, 2024       Wilmington, VT

This basin plan provides an overall assessment of the current conditions of the watershed, identifies high priority waters for restoration and protection, and directs funding to implement projects that protect, enhance, and restore aquatic habitat that supports the uses and values such as swimming, fishing, and boating. 

Basin 12 includes 18 towns including Brattleboro, Dover, Stratton, and Wilmington.  It encompasses the Deerfield and Green Rivers and the East Branch of the North River which all flow into central Massachusetts to the Connecticut River. The tributary streams that flow directly into the Connecticut River include Whetstone, Broad and Newton Brooks.

Map of Basin 12
Basin 12 Towns and Sub-watersheds


2020 Tactical Basin Plan

2014 Tactical Basin Plan and Appendices

Basin Assessment Report Basin 12 - Deerfield River and Connecticut River Direct (June 2023)

Additional Resources

Partners

Marie Levesque Caduto, Watershed Planner
Vermont ANR / Department of Environmental Conservation
100 Mineral Street, Suite 303 
Springfield, VT 05156-3168
Phone: 802-490-6142
Email: Marie.Caduto@vermont.gov